【标题】125MW联合循环汽轮机异常振动问题的综合治理
【Title】Comprehensive Treatment on 125MW Combined Cycle Turbine Abnormal Vibration
【摘要】分析了造成某联合循环发电厂两台 125MW汽轮机带负荷过程中振动大、启动暖机性能差的相关因素,通过综合治理,收到了很好的效果。
【Abstract】The relevant factors which have caused big vibrations and bad start-up warming performance of the turbine during the loading process of one combined cycle power plant with two 125MW units are analyzed. After the comprehensivetreatment,thereisaverygoodeffect.
【关键词】联合循环;汽轮机;异常振动;综合治理
【Keywords】combined cycle; turbine; abnormal vibration; comprehensive treatment
【作者】张丁旺 | :中电投电力工程有限公司技术中心,上海市闵行区田林路 888弄 7号 20023; |
王宏伟 | :中电投电力工程有限公司技术中心,上海市闵行区田林路 888弄 7号 20023; |
吴金辉 | :中电投电力工程有限公司技术中心,上海市闵行区田林路 888弄 7号 20023; |
Zhang Dingwang | : CPI Power Engineering CO., Ltd. Technical centre NO.7, Lane 888, Tianlin Road, Minhang District, Shanghai; |
Wang Hong | : CPI Power Engineering CO., Ltd. Technical centre NO.7, Lane 888, Tianlin Road, Minhang District, Shanghai; |
weiWu Jinhui | : CPI Power Engineering CO., Ltd. Technical centre NO.7, Lane 888, Tianlin Road, Minhang District, Shanghai; |
【来源】2016年中国工程电机学会年会论文集
【出版时间】Tue Nov 15 00:00:00 CST 2016